ABADIE provided hydraulic, engineering, subject matter expertise, and design services to ExxonMobil Pipeline Company (“EMPCo”) for consideration to expand the throughput of the LOLA pipeline system from 5,000 BPH to 9,000 BPH at the EMPCo Anchorage Terminal.